Well folks, Deltek have punched out another HotFix for Cobra 5.1. Installing HotFix 5 Build 5.01.282 will bring your Deltek Cobra installation up to the latest version. As usual, this is a cumulative install and will include all prior HotFixes, so you can jump from earlier builds right up to this one if you haven’t been doing regular updates.
You can download the HotFix 5 Build 5.01.282 via the Deltek Customer Care Select site. This build fixes another dozen glitches largely concerned with the Integration Wizard and the wInsight Integration tool. I’ve listed the headings and defect tracking numbers here, but you can find the details for these in the DeltekCobra51HotFix05ReadMe.pdf file that downloads with the HotFix 5 Build 5.01.282 zip file.
- Data Tool Issue – 175081
- Integration Wizard – Project Data – 166801
- Backup – 170109
- Integration Wizard – Project Data – 171344
- Integration Wizard – Project Data – 173585
- Integration Wizard – Actual Costs – 173747
- Integration wInsight – 174097
- Integration wInsight – 174288
- Integration wInsight – 174295
- Integration Wizard – Project Data – 174864
- Reports – 178174
- Process Logs – 174901
Enjoy the Holiday weekend!